EN
"Thanks to the outstanding collaboration with Phoenix Mecano, we were able to develop an efficient and innovative material supply solution that has not only optimized our processes, but has also made a significant contribution to increasing productivity and efficiency."
Philip Sommerhalder
Director Pre-Assembly, Pilatus Aircraft Ltd

step one

Initial situation

Pilatus Aircraft Ltd develops and builds unique aircraft worldwide. Precision and efficiency are of crucial importance in production. In order to carry out the interior fitting of the aircraft efficiently, the material for the assemblies to be fitted is prepared in advance in sorting boxes, which are then taken into the aircraft for final assembly. Unfortunately, during assembly, it is often discovered that the number of parts in the sorting box is incorrect or, even worse, that the wrong component has been prepared. This is very annoying. The fitter has to interrupt the work and procure and obtain the missing or incorrect parts from the warehouse, which increases the assembly time and therefore incurs unnecessary costs.

step two

Challenge

The goal for the future is clear. The sorting boxes must be assembled correctly without errors. Different assemblies and variants are put together from over 1,200 articles. There is a parts list for each variant. The picking time also needs to be reduced. The parts are stored in different locations on shelves and in cabinets.

Your contact person

Would you also like to benefit from our solutions and write your own success story with us? Then contact me.

Foto Lukas Hänni
Lukas Hänni
Projektleiter Sales Profiltechnik / LEAN Production
Project Manager Sales Profile Technology / LEAN Production
Responsable de projet Sales Technique de profilés / LEAN Production
+41 52 742 75 04
lukas.haenni@phoenix-mecano.ch
Online Termin buchen